Is there anybody else that uses the following:
Incoming AND rule operator connecting to any of the following outgoing rule operators: AND / OR / XOR?
Incoming OR rule operator connecting to any of the following outgoing rule operators: AND / OR / XOR?
Incoming XOR rule operator connecting to any of the following outgoing rule operators: AND / OR / XOR?
Is all the scenarios listed above valid?
I am interested in gaining better understanding of the rules that pertains to allowing for this type of flow from a process perspective.
Forum: