Hello, 

I am trying to design a process in Aris business architect 7.2 using EPC model

The problem is when I use column EPC I can't build flow from two events to a process through AND gate - it just reverses the connector direction and what I get is a flow from a process to two events through AND gate.

If I use standard EPC model (not columns) it works all right - (event and event)  --> process.

Is there any way to do so in column EPC?